Resurfacing
Including catch basin and manhole adjustments, spot curb replacement, and replacement of non-compliant ADA curb ramps.
- Coventry Road (Fairhill to Euclid Heights Blvd.)
- Lee Road (Mayfield to Superior)
- East Overlook (Coventry to Euclid Heights Blvd.) – Waterline and Road Resurfacing
- Warrensville Center Road – Cleveland Heights side (Mayfield to City South Corp Limit)
2023 Construction Projects
- New Traffic Signal at the Intersection of Fairmount, Coventry and Scarborough (in conjunction with Coventry Road Resurfacing Project)
- Lee Road SSO Project (Euclid Heights Blvd from Lee Road to Cumberland – Control of SSOs at Lee & Euclid Heights Blvd.; Lee & Superior and Euclid Heights Blvd and Cumberland)
- Monticello Boulevard Signalization Project (Belvoir to Mayfield)
- Cedar Glen Sanitary Sewer Replacement Project
- Compton Greenway Project (Installation of mini traffic circles at the intersections of Beachwood, Altamont, Desota and Berkeley and a multi-use path connecting Compton)
- Cedar Lee ADA Ramp Project (Replacement of ADA Ramp and steps at the Cedar Lee Mini Park)
- Fairmount & Coventry SSO Control Project