2023 Road Program

Resurfacing

Including catch basin and manhole adjustments, spot curb replacement, and replacement of non-compliant ADA curb ramps.

  • Coventry Road (Fairhill to Euclid Heights Blvd.)
  • Lee Road (Mayfield to Superior)
  • East Overlook (Coventry to Euclid Heights Blvd.) – Waterline and Road Resurfacing
  • Warrensville Center Road – Cleveland Heights side (Mayfield to City South Corp Limit)

2023 Construction Projects

  • New Traffic Signal at the Intersection of Fairmount, Coventry and Scarborough (in conjunction with Coventry Road Resurfacing Project)
  • Lee Road SSO Project (Euclid Heights Blvd from Lee Road to Cumberland – Control of SSOs at Lee & Euclid Heights Blvd.; Lee & Superior and Euclid Heights Blvd and Cumberland)
  • Monticello Boulevard Signalization Project (Belvoir to Mayfield)
  • Cedar Glen Sanitary Sewer Replacement Project 
  • Compton Greenway Project (Installation of mini traffic circles at the intersections of Beachwood, Altamont, Desota and Berkeley and a multi-use path connecting Compton)
  • Cedar Lee ADA Ramp Project (Replacement of ADA Ramp and steps at the Cedar Lee Mini Park)
  • Fairmount & Coventry SSO Control Project